Sports Complexes

750x150_SPORTS.jpg

Energy Solutions Arena (Formerly Delta Center)

Building Highlights: 20,500 Seating Capacity Arena / 743,000 ft.² / Level 1 - Utah Jazz locker room Eagle locker room, Press room, Mechanical/Electrical room, Storage and Marshaling areas, Multi-purpose rooms / Level 2 - Main ticket office, Jazz/Eagle/Facility Management offices, Kitchen/Commissary, Hospitality rooms, Pro Image outlet / Level 3 - Main concourse (access to lower bowl and outside pedestrian plaza), public restrooms, concessions, novelty areas / Level 4 - Fifty-Six (56) private suites and two (2) rows of private seating / Level 5 - Upper concourse (access to upper bowl), public restrooms, concessions, novelty areas / Level 6 - Twenty-Three (23) skysuites (at sides and ends of arena), four (4) skyboxes (restaurant/hospitality areas of each of the four corners) / Level 7 - Mechanical areas above stair towers only / Mechanical Systems: Three (3) centrifugal chillers producing approximately 1,800 tons of chilled water, Two (2) 2,000 gallon per minute oscillating water cannons operated from the sound booth via a computer linked joystick, Fifty-six (56) individual VAV control boxes to maintain comfort conditions in each suite, Four (4) custom-built 75,000 CFM air handlers serving main arena seating area, capable of a complete exchange of air approx. every 15 minutes.


Additional Info

  • Location: Salt Lake City, Utah
  • Project Owner / Client: Larry H. Miller Arena Corporation
  • General Contractor: O.C./Sahara (a joint venture between Obayashi Corporation & Sahara, Inc.)
  • Architect: FFKR
  • Mechanical Engineer: N/A
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Plumbing, and Fire Protection

 

University of Utah - Indoor Practice Facility

Building Highlights: Indoor Practice Field and Annex / Practice Field: 73,964 ft.² / Annex Area: 2,708 ft.² / "Fast Track": Start: August 2004 - Completion: November 2004 / Mechanical Systems: Sixteen (16) 400,000 BTUH High Efficiency Gas Fired Unit Heaters, One (1) Indoor Makeup Air Unit - 7,500 CFM, Two (2) Split System Furnaces - 10 Tons Cooling, Three (3) Exhaust Fans, Forty-Three (43) Plumbing Fixtures, 1,700 Lineal Feet of Domestic Water Piping, 1,000 Lineal Feet of Welded Natural Gas Piping with Seismic Valve.


Additional Info

  • Location: Salt Lake City, Utah
  • Project Owner / Client: University of Utah
  • General Contractor: Okland Construction Co., Inc.
  • Architect: VCBO Architecture
  • Mechanical Engineer: Spectrum Engineers
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

N.B.A. Training Facility

Building Highlights: Warehouse Remodel to Professional Training Facility - 48,900 ft.² / Main Level: 36,900 ft.² / Second Level: 12,000 ft.² / "Fast Track" - Start: August 2002 - Completion: March 2003 / Mechanical Systems: Fourteen (14) Rooftop Units - 205 Tons Cooling, One (1) 491,103 BTU Domestic Hot Water Boiler with Storage Tanks, One Hundred Forty-One (141) Plumbing Fixtures, Steam Generator for Steam Room, Addressable Alerton DDC Controls System


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Larry H. Miller Group
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Design-Build: Engineering, Heating, Ventilation, Air Conditioning, Plumbing, and Temperature Controls

 

South Summit Health and Fitness

Building Highlights: Fitness Center w/Locker and Exercise Rooms, Recreation and Lap Pools, and Climbing Wall -52,416 ft.² Total / Start: July 2002 - Completion: August 2003 / Mechanical Systems: Three (3) DX Air Handlers and Condensing Units - 44 Tons Cooling, Two (2) Heat Recovery Units - 60,560 Total CFM, One (1) Rooftop Unit - 4 Tons Cooling, Three (3) Hot Water Unit Heaters, Five (5) Exhaust Fans, Three (3) Ventilation Hoods, Two (2) 3,500 MBH Hot Water Boilers, Three (3) Shell and Tube Heat Exchangers, One (1) 560 Gallon Storage Tank, One (1) Air Separator and Four (4) Inline Pumps, Five Hundred Feet (500') of 58" Diameter Aluminum Duct for Pool Area.


Additional Info

  • Location: Kamas, UT
  • Project Owner / Client: South Summit School District
  • General Contractor: Okland Construction Co., Inc.
  • Architect: VCBO Architecture
  • Mechanical Engineer: Spectrum Engineers
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing

 

Sublette County Aquatic Center

Building Highlights: Remodel of existing pool and addition of pool, basketball court, racquetball court, offices, locker rooms / Total Square Feet - 88,000 Sq.Ft. / Start: June 2006 - Completion: November 2007 / Mechanical Systems: Four (4) New Rooftop Units, One (1) Air Handling Unit with Hot Water Coils, Pool Air Dehumidification, Four (4) Boilers with Pumps, Two (2) Fan Coil Units, and Fifty-Four (54) Plumbing Fixtures


Additional Info

  • Location: Pinedale, WY
  • Project Owner / Client: Pinedale Aquatic Center
  • General Contractor: Okland Construction Co., Inc.
  • Architect: VCBO
  • Mechanical Engineer: Spectrum Engineers and Van Boerum & Frank Associates
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing