Schools
Skaggs Catholic Center
Building Highlights: High School - Middle School - Elementary School - Daycare - Total 350,000 Sq. Ft. / Start: October 1997 - Completion: August 1999 / Mechanical Systems: Two (2) Boilers - 7 Million BTU Each, One (1) Chiller - 548 Ton Cooling, One (1) Cooling Tower, Forty (40) Pumps, Sixteen (16) Air Handling Units, Three Hundred (300) VAV Boxes, Forty (40) Exhaust Fans, Twenty-seven (27) Return/Relief Fans, Three (3) Make-up Air Units, One (1) Rooftop Unit, Approx. Six Hundred (600) Plumbing Fixtures, Two (2) Pre-cast Concrete Grease Interceptors, Five (5) Domestic Water Heaters, One (1) Water Softner, One (1) Air Compressor with all required Compressed Air Piping, and a complete Air Distribution Piping System throughout Classroom Labs.
Additional Info
- Location: Draper, UT
- Project Owner / Client: Catholic Diocese of Salt Lake City
- General Contractor: Big-D Construction Corp.
- Architect: MHTN Architects
- Mechanical Engineer: Olsen & Peterson (Plumbing) and Van Boerum & Frank (Mechanical / HVAC)
- Mechanical Contractor: CCI Mechanical, Inc. (Plumbing/Piping) and Western Sheet Metal (HVAC)
- CCI Mechanical Role: Plumbing / Piping
Pinedale Elementary
Building Highlights: Kindergarten - 5th Grades Single Story Elementary School - 82,000 Sq. Ft. / Central Kitchen for Elementary, Jr. High, and High School / Administration, Offices, Classrooms, Study Areas, Science/Music/Art Classes, Multiple Computer Labs, Gymnasium / LEED Equivalent Standards Adapted for Owner Needs and Climate Restrictions / Architectural Design Compliments Area History, Geography, and Culture / Start: June 2009 - Completion: August 2010 / Mechanical Systems: Six (6) Penthouse VAV Air Handling Units, Three (3) Condensing Boilers w/Four (4) Pumps, One (1) 30-Ton DX Condensing Unit, Heating System Redundancy Critical to Protect Against -20° Design Temperatures, Snowmelt Zones at all Entryways Utilizing 18,000 Lineal Ft. Tubing, Kitchen Exhaust and Make-up Air Systems, One Hundred Sixteen (116) Plumbing Fixtures, including Group Lavatories and Classroom Sinks with Drinking Fountains.
Additional Info
- Location: Pinedale, Wyoming
- Project Owner / Client: Sublette County School District
- General Contractor: Layton Construction Co., Inc.
- Architect: Sandstrom Architects
- Mechanical Engineer: CCI Mechanical, Inc. (Design-Build)
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Plumbing/Piping, Temperature Controls, Lighting Controls, Start-up, and Commissioning
Ogden Weber Applied Technology College
Building Highlights: Health Technologies Education Bldg. - 86,000 Sq. Ft. / Classroom Levels 1 and 2 with Offices, Labs, and Student Areas / Solar Panel Heating, IDEC Cooling, and Adaptive Controls / LEED / Start: May 2010 - Completion: June 2011 / Mechanical Systems: One (1) Penthouse VAV Air Handling Unit, One Hundred (100) VAV Boxes, IDEC Cooling w/Economizer, Radiant Floor Heat at Entryways, Two (2) Boilers w/Two (2) Pumps, One (1) Expansion Tank, and One (1) Air Separator, Seven (7) Exhaust Fans, Four (4) Relief Fans, and Sound Attenuation System, Siemens Adaptive Building Controls, One Hundred Sixty-three (163) Plumbing Fixtures, Solar Domestic Water Heater, Metering Gas and Water Valves, Two (2) 50-Ton Modular Chillers w/Cooling Tower.
Additional Info
- Location: Ogden, UT
- Project Owner / Client: Ogden Weber Applied Technology College
- General Contractor: Okland Construction Co., Inc.
- Architect: GSBS Architects
- Mechanical Engineer: Colvin Engineering (Design Assist)
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Temperature Controls, Plumbing, and Commissioning
The McGillis School
Building Highlights: Historic School Renovation/Preservation - 18,000 Sq.Ft. / Classroom Levels 1 and 2 - 8,500 Sq.Ft. each / Basement - 1,000 Sq.Ft. / Start: December 2002 - Completion: August 2003 / Mechanical Systems: One (1) VAV Rooftop Unit – 60 Tons Cooling, Sixteen (16) VAV Reheat Boxes, One (1) 8,800 CFM Direct Fired Makeup Air Unit, One (1) Laboratory Fume Hood, Two (2) Electric Cabinet HeatersOne (1) Boiler with Two (2) Pumps, One (1) Expansion Tank and One (1) Air Separator, Seven (7) Exhaust Fans, Alerton DDC System, Digital Controllers for each Building System and Graphical Workstation / Winner of the 2003 Intermountain Contractor Best Renovation/Preservation Project
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: The McGillis Jewish Community Center School
- General Contractor: Eckman & Mitchell Construction, LLC
- Architect: GA Architects
- Mechanical Engineer: PVE Engineering
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls
Salt Lake Community College - Larry H. Miller Campus, Public Safety Education & Training Center
Building Highlights: Three-Floor Building (Total 76,000 Sq.Ft.) / Classrooms and Training Facilities for Law Enforcement Officers / Three (3) Gyms, Weight Room, Locker Rooms, Three (3) Tiered Lecture Halls, Four (4) Firearm Simulator Rooms, Fourteen (14) Classrooms, Crime Labs, Defensive Tactics Training, Intoxilizer Room, Offices, and UHP Video Center / Start: September 2006 - Completion: November 2007 / Mechanical Systems: One (1) 200-ton Chiller, Two (2) Each 2.1M BTU Hot Water Boilers, One (1) Air Handler, Two (2) Heat Exchangers, Water Treatment System
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: Larry H. Miller Family Real Estate, LLC
- General Contractor: Sahara, Inc.
- Architect: FFKR
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing