Office Buildings

Daybreak Corporate Center

c889234799e865bbe90cee71f6cd2e53_S.jpg

Building Highlights: LEED Platinum / Three-Story Building / 178,000 ft.² / Three-Story Parking / Started: July 2006 - Completed: October 2008 / Mechanical Systems Include: Two (2) Direct/In-direct Air Handlng Units on Roof, Two (2) Cooling Towers, One (1) 300-Ton Chiller, and a Three-Zone Snowmelt System.
 


Additional Info

  • Location: South Jordan, UT
  • Project Owner / Client: Rio Tinto / Kennecott Land Company
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

 

Petzl Headquarters

3749aaa8ee129d7e919bddcc7e09cd36_S.jpg

Building Highlights: 50,000 Sq. Ft. of Warehouse Space -  28,000 Sq. Ft. Office Space


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Petzl Corporation
  • General Contractor: Sahara Inc.
  • Architect: AJC Architects
  • Mechanical Engineer: Colvin Engineering
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Plumbing and Temperature Controls

 

River Park - Phase I

f4b6dca0e2911082f0eb6e1df1a0e11d_S.jpg

Building Highlights: Three-Level Office Building, Core and Shell / Total Building - 99,000 ft.² / Start: February 2001 - Completion: December 2001 / Mechanical Systems: Three (3) Air Handling Units with Variable Frequency Drives, Twelve (12) VAV Boxes, One (1) 250 Ton Chiller, One (1) 1,435 MBH Boiler, Four (4) Pumps, Sixty-Seven (67) Plumbing Fixtures, Complete Johnson Metasys Building Automation System, including Lighting Controls


Additional Info

  • Location: South Jordan, UT
  • Project Owner / Client: RiverPark One, LLC
  • General Contractor: Layton Construction Co., Inc.
  • Architect: MHTN Architects
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Plumbing, and Controls

 

Jordan Commons Office Tower

4965657af186b9092c7a96976ffe881c_S.jpg

Building Highlights: 10-Story Office Tower / Start: July 1998 - Completion: August 1999 / Mechanical Systems: Two (2) 250 Ton Chillers, Ten (10) Air Handlers (1 per floor), Two (2) Hot Water Boilers - 4,000,000 BTU's each, Seventeen (17) Pumps, Thirty (30) VAV Boxes per Floor, One (1) Cooling Tower on Roof, Six (6) Different Snowmelt Systems, and Alerton Controls with Energy Management System


Additional Info

  • Location: Sandy, UT
  • Project Owner / Client: Larry H. Miller Group
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

 

Clearwater Center

077ab55046ce80eaf9a3ddea999597ca_S.jpg

Building Highlights: Three-Story Office Building / 15,000 ft.² / Exterior Water Fountain / Start: July 1998 - - Completion: January 1999 / Mechanical Systems: Three (3) Rooftop Units - 40 Tons Each, One (1) Boiler - 1.5 Million BTUs, Two (2) Building Relief Fans, One (1) Exhaust Fan, HVAC and Lighting Monitoring System, Completely Designed and Constructed Exterior Water Fountain, Pumps and Controls for Exterior Water Fountain, Twelve (12) Electronic Operated Water Closets and Urinals, Twelve (12) Electronic Operated Lavatories, Three (3) Electric Water Coolers, and Complete Domestic Water Heating System.


Additional Info

  • Location: Bountiful, UT
  • Project Owner / Client: Sahara, Inc.
  • General Contractor: Sahara, Inc.
  • Architect: Gilles Stranskey Brems Smith Architects
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

 

Wells Fargo Center (formerly American Stores Corporate Headquarters)

c9b002fe1bb0320831a8ae78670fdb6f_S.jpg

Building Highlights: 25-Story Office Building / 640,000 ft.² / Basement, Mechanical Room, Kitchen/Restaurant Prep and Storage / Floor 1 - Grocery Store and Retail / Floor 2 - Restaurant/Bar and Office / Floor 3 - Tech Ops/Training / Floors 4-22 - Typical Offices / Floors 23-24 - Executive Offices / Floor 25 - Penthouse Mechanical Room / Roof - Two (2) Helipads (Note: Approximately 14,000 ft.² of snowmelt piping covers penthouse and roof). / Parking Structure Highlights: 532,000 ft.² (1,456 parking stalls), Levels B1 and B2 - Underground Parking, Ground Level - Retail, Health Club, and Parking, Levels 2-7 - Typical Parking Cooling Towers on 6th Level). / Start: November 1995 - Completion: January 1998 / Mechanical Systems: Three (3) Chillers (1,700 Total Cooling Tons), Forty-One (41) Air Handling Units (40 Cooling Only), Six Hundred Forty (640) Variable Air Volume Boxes (Cooling Only), One Hundred Thirty (130) Fan Powered Boxes (w/Hot Water Coils), Three (3) Boilers (21,000,000 Total BTU's), Sixteen Thousand (16,000) ft. (approximately) of Hot Water Fin Tube, Four Thousand Two Hundred (4,200) Registers, Grilles, and Diffusers, Seven Hundred (700) Plumbing Fixtures.


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Wasatch Property Management, Inc.
  • General Contractor: Howa Construction, Inc.
  • Architect: HKS, Inc.
  • Mechanical Engineer: Blum Engineering, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

Broadway Center

fc1da7257992fc36032e11db3df7a664_S.jpg
 

Building Highlights: 14-Story Office Building / Four (4) Theaters / Ground Level Restaurants / 185,000 ft.² / Start: March 1990 - Completion: August 1991 / Mechanical Systems: Two (2) Water Cooled Chillers, One (1) Cooling Tower, One (1) Boiler, Hot Water Baseboard Heating Throughout, Emergency Generator Exhaust System, One Hundred Fifty-Six (156) Plumbing Fixtures, One (1) Domestic Hot Water System Recirculation.


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Broadway Center, Ltd.
  • General Contractor: Pentalon Construction
  • Architect: Edwards and Daniels Architects, Inc.
  • Mechanical Engineer: Colvin Engineering Associates, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

River Park - Phase 3

620466077c427f141effa294382f5fba_S.jpg

Building Highlights: Four-Level Office Building, Core and Shell / Total Building – 92,000 Sq.Ft. / Start: April 2004 - Completion: March 2005 / Mechanical Systems: Four (4) Air Handling Units with Variable Frequency Drives, Sixty-eight (68) VAV Boxes, One (1) 250 Ton Chiller, One (1) 1,016 MBH Boiler, Eight (8) Pumps, Eight-two (82) Plumbing Fixtures, Complete Johnson Metasys Building Automation System, including Lighting Controls


Additional Info

  • Location: South Jordan, UT
  • Project Owner / Client: RiverPark Three, LLC
  • General Contractor: Layton Construction Co., Inc.
  • Architect: MHTN Architects
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Plumbing and Controls

 

Thanksgiving Park - Building I

90701d02ae3da0e5a21abbd900c25748_S.jpg

Building Highlights: LEED Silver / Five-Floor Office Building / Total 141,000 Sq.Ft. (28,200 Sq.Ft. per floor) / Start: November 2007 - Completion: November 2008 / Mechanical Systems: One (1) Chiller – 340 Tons (High Efficiency), One (1) Boiler – 2 Million BTU’s (High Efficiency), Six (6) Pumps, Five (5) Air Handling Units, Two (2) Unit Heaters, Two (2) Water Heaters, Sixteen (16) Roof Drains, Thirty (30) Lavatories, Forty (40) Toilets


Additional Info

  • Location: Lehi, UT
  • Project Owner / Client: Thanksgiving Park
  • General Contractor: Camco Construction Co., Inc.
  • Architect: Beecher Walker & Associates
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing

 

The Point Office Building #2

a27a3b73d355048c6bab885897085f62_S.jpg

Building Highlights: Four-Story Office Building, Core and Shell / 113,244 Sq.Ft. Total (28,311 Sq.Ft. per Floor) / Start: December 2006 - Completion: October 2007 / Mechanical Systems: One (1) Chiller – 300 Tons (Roof), One (1) Boiler – 1,100,000 BTU’s (4th Floor), Six (6) Pumps, Four (4) Air Handlers, Seven (7) VFD’s, Eighteen (18) VAV Boxes (4 per floor with 2 extra on Level 1), Johnson Controls


Additional Info

  • Location: Draper, UT
  • Project Owner / Client: Sorenson Group
  • General Contractor: Camco Construction Co., Inc.
  • Architect: Beecher Walker & Associates
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing

 

Codale Electric

e9c724eeb5636d1c1c1a2c2e85d40377_S.jpg

Building Highlights: Two Buildings / Total Square Footage - 222,657 Sq.Ft. (Maintenance Building - 13,400 Sq.Ft. / Office Area - 30,000 Sq.Ft. / Warehouse Area - 179,257 Sq.Ft.) / Two-Story Office, One-Story Warehouse / Start: June 2008 - Completion: October 2009 / Mechanical Systems: Office - VAV system with Thirty-Five (35) VAV boxes, Warehouse - MUA Units and Radiant Heaters. Two (2) Through-the-wall Units for offices in the Warehouse; Maintenance Building - MUA Units and Radiant Heaters with One (1) RTU for Restrooms; One (1) Boiler (985,000 BTUs), Five (5) Pumps, and Seventy (70) Plumbing Fixtures


Additional Info

  • Location: West Valley City, UT
  • Project Owner / Client: Codale Electric
  • General Contractor: Camco Construction Co., Inc.
  • Architect: Chris Layton & Associates
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing