Office Buildings

750x150_OFFICE BUILDINGS.jpg

Thanksgiving Station 1

Building Highlights: 5-Story Class A Office Building / Parking Structure / 163,000 Square Feet / Green Building Design


Additional Info

  • Location: Lehi, Utah
  • Project Owner / Client: Thanksgiving Park
  • General Contractor: Jacobsen Construction
  • Architect: Beecher, Walker & Associates
  • Mechanical Engineer: CCI Mechanical
  • CCI Mechanical Role: Engineering, HVAC, Plumbing

 

Sandy Tower East

Building Highlights: 5-Story Class A Office Building / 390,000 Square Feet / LEED Silver


Additional Info

  • Location: Sandy, Utah
  • Project Owner / Client: STACK Real Estate
  • General Contractor: Jacobsen Construction
  • Architect: Walker Architects
  • Mechanical Engineer: CCI Mechanical
  • CCI Mechanical Role: Engineering, HVAC, Plumbing

 

SoJo TOD North

Building Highlights: 6-Story Class A Office Building / Parking Garage / 180,000 Square Feet (Each Building) / Transit Oriented Development / LEED Silver


Additional Info

  • Location: South Jordan, Utah
  • Project Owner / Client: STACK Real Estate
  • General Contractor: Jacobsen Construction
  • Architect: Beecher Walker Architects
  • Mechanical Engineer: CCI Mechanical
  • CCI Mechanical Role: Engineering, HVAC, Plumbing

 

CHG Healthcare

Building Highlights: (2) 5-Story Office Buildings with Parking Structure / 270,000 Square Feet / LEED Certified


Additional Info

  • Location: Midvale, Utah
  • Project Owner / Client: CHG Healthcare
  • General Contractor: Okland Construction
  • Architect: MHTN
  • Mechanical Engineer: CCI Mechanical
  • CCI Mechanical Role: Engineering, HVAC, Plumbing

 

Daybreak Corporate Center

Building Highlights: LEED Platinum / Three-Story Building / 178,000 ft.² / Three-Story Parking / Started: July 2006 - Completed: October 2008 / Mechanical Systems Include: Two (2) Direct/In-direct Air Handlng Units on Roof, Two (2) Cooling Towers, One (1) 300-Ton Chiller, and a Three-Zone Snowmelt System.
 


Additional Info

  • Location: South Jordan, UT
  • Project Owner / Client: Rio Tinto / Kennecott Land Company
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

 

Petzl Headquarters

Building Highlights: 50,000 Sq. Ft. of Warehouse Space -  28,000 Sq. Ft. Office Space


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Petzl Corporation
  • General Contractor: Sahara Inc.
  • Architect: AJC Architects
  • Mechanical Engineer: Colvin Engineering
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Plumbing and Temperature Controls

 

Wells Fargo Center (formerly American Stores Corporate Headquarters)

Building Highlights: 25-Story Office Building / 640,000 ft.² / Basement, Mechanical Room, Kitchen/Restaurant Prep and Storage / Floor 1 - Grocery Store and Retail / Floor 2 - Restaurant/Bar and Office / Floor 3 - Tech Ops/Training / Floors 4-22 - Typical Offices / Floors 23-24 - Executive Offices / Floor 25 - Penthouse Mechanical Room / Roof - Two (2) Helipads (Note: Approximately 14,000 ft.² of snowmelt piping covers penthouse and roof). / Parking Structure Highlights: 532,000 ft.² (1,456 parking stalls), Levels B1 and B2 - Underground Parking, Ground Level - Retail, Health Club, and Parking, Levels 2-7 - Typical Parking Cooling Towers on 6th Level). / Start: November 1995 - Completion: January 1998 / Mechanical Systems: Three (3) Chillers (1,700 Total Cooling Tons), Forty-One (41) Air Handling Units (40 Cooling Only), Six Hundred Forty (640) Variable Air Volume Boxes (Cooling Only), One Hundred Thirty (130) Fan Powered Boxes (w/Hot Water Coils), Three (3) Boilers (21,000,000 Total BTU's), Sixteen Thousand (16,000) ft. (approximately) of Hot Water Fin Tube, Four Thousand Two Hundred (4,200) Registers, Grilles, and Diffusers, Seven Hundred (700) Plumbing Fixtures.


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Wasatch Property Management, Inc.
  • General Contractor: Howa Construction, Inc.
  • Architect: HKS, Inc.
  • Mechanical Engineer: Blum Engineering, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

Broadway Center
 

Building Highlights: 14-Story Office Building / Four (4) Theaters / Ground Level Restaurants / 185,000 ft.² / Start: March 1990 - Completion: August 1991 / Mechanical Systems: Two (2) Water Cooled Chillers, One (1) Cooling Tower, One (1) Boiler, Hot Water Baseboard Heating Throughout, Emergency Generator Exhaust System, One Hundred Fifty-Six (156) Plumbing Fixtures, One (1) Domestic Hot Water System Recirculation.


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: Broadway Center, Ltd.
  • General Contractor: Pentalon Construction
  • Architect: Edwards and Daniels Architects, Inc.
  • Mechanical Engineer: Colvin Engineering Associates, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

Thanksgiving Park - Building I

Building Highlights: LEED Silver / Five-Floor Office Building / Total 141,000 Sq.Ft. (28,200 Sq.Ft. per floor) / Start: November 2007 - Completion: November 2008 / Mechanical Systems: One (1) Chiller – 340 Tons (High Efficiency), One (1) Boiler – 2 Million BTU’s (High Efficiency), Six (6) Pumps, Five (5) Air Handling Units, Two (2) Unit Heaters, Two (2) Water Heaters, Sixteen (16) Roof Drains, Thirty (30) Lavatories, Forty (40) Toilets


Additional Info

  • Location: Lehi, UT
  • Project Owner / Client: Thanksgiving Park
  • General Contractor: Camco Construction Co., Inc.
  • Architect: Beecher Walker & Associates
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing