Office Buildings
Thanksgiving Station 1
Building Highlights: 5-Story Class A Office Building / Parking Structure / 163,000 Square Feet / Green Building Design
Additional Info
- Location: Lehi, Utah
- Project Owner / Client: Thanksgiving Park
- General Contractor: Jacobsen Construction
- Architect: Beecher, Walker & Associates
- Mechanical Engineer: CCI Mechanical
- CCI Mechanical Role: Engineering, HVAC, Plumbing
Sandy Tower East
Building Highlights: 5-Story Class A Office Building / 390,000 Square Feet / LEED Silver
Additional Info
- Location: Sandy, Utah
- Project Owner / Client: STACK Real Estate
- General Contractor: Jacobsen Construction
- Architect: Walker Architects
- Mechanical Engineer: CCI Mechanical
- CCI Mechanical Role: Engineering, HVAC, Plumbing
SoJo TOD North
Building Highlights: 6-Story Class A Office Building / Parking Garage / 180,000 Square Feet (Each Building) / Transit Oriented Development / LEED Silver
Additional Info
- Location: South Jordan, Utah
- Project Owner / Client: STACK Real Estate
- General Contractor: Jacobsen Construction
- Architect: Beecher Walker Architects
- Mechanical Engineer: CCI Mechanical
- CCI Mechanical Role: Engineering, HVAC, Plumbing
CHG Healthcare
Building Highlights: (2) 5-Story Office Buildings with Parking Structure / 270,000 Square Feet / LEED Certified
Additional Info
- Location: Midvale, Utah
- Project Owner / Client: CHG Healthcare
- General Contractor: Okland Construction
- Architect: MHTN
- Mechanical Engineer: CCI Mechanical
- CCI Mechanical Role: Engineering, HVAC, Plumbing
Daybreak Corporate Center
Building Highlights: LEED Platinum / Three-Story Building / 178,000 ft.² / Three-Story Parking / Started: July 2006 - Completed: October 2008 / Mechanical Systems Include: Two (2) Direct/In-direct Air Handlng Units on Roof, Two (2) Cooling Towers, One (1) 300-Ton Chiller, and a Three-Zone Snowmelt System.
Additional Info
- Location: South Jordan, UT
- Project Owner / Client: Rio Tinto / Kennecott Land Company
- General Contractor: Sahara, Inc.
- Architect: FFKR
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing
Petzl Headquarters
Building Highlights: 50,000 Sq. Ft. of Warehouse Space - 28,000 Sq. Ft. Office Space
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: Petzl Corporation
- General Contractor: Sahara Inc.
- Architect: AJC Architects
- Mechanical Engineer: Colvin Engineering
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Plumbing and Temperature Controls
Wells Fargo Center (formerly American Stores Corporate Headquarters)
Building Highlights: 25-Story Office Building / 640,000 ft.² / Basement, Mechanical Room, Kitchen/Restaurant Prep and Storage / Floor 1 - Grocery Store and Retail / Floor 2 - Restaurant/Bar and Office / Floor 3 - Tech Ops/Training / Floors 4-22 - Typical Offices / Floors 23-24 - Executive Offices / Floor 25 - Penthouse Mechanical Room / Roof - Two (2) Helipads (Note: Approximately 14,000 ft.² of snowmelt piping covers penthouse and roof). / Parking Structure Highlights: 532,000 ft.² (1,456 parking stalls), Levels B1 and B2 - Underground Parking, Ground Level - Retail, Health Club, and Parking, Levels 2-7 - Typical Parking Cooling Towers on 6th Level). / Start: November 1995 - Completion: January 1998 / Mechanical Systems: Three (3) Chillers (1,700 Total Cooling Tons), Forty-One (41) Air Handling Units (40 Cooling Only), Six Hundred Forty (640) Variable Air Volume Boxes (Cooling Only), One Hundred Thirty (130) Fan Powered Boxes (w/Hot Water Coils), Three (3) Boilers (21,000,000 Total BTU's), Sixteen Thousand (16,000) ft. (approximately) of Hot Water Fin Tube, Four Thousand Two Hundred (4,200) Registers, Grilles, and Diffusers, Seven Hundred (700) Plumbing Fixtures.
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: Wasatch Property Management, Inc.
- General Contractor: Howa Construction, Inc.
- Architect: HKS, Inc.
- Mechanical Engineer: Blum Engineering, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing
Broadway Center
Building Highlights: 14-Story Office Building / Four (4) Theaters / Ground Level Restaurants / 185,000 ft.² / Start: March 1990 - Completion: August 1991 / Mechanical Systems: Two (2) Water Cooled Chillers, One (1) Cooling Tower, One (1) Boiler, Hot Water Baseboard Heating Throughout, Emergency Generator Exhaust System, One Hundred Fifty-Six (156) Plumbing Fixtures, One (1) Domestic Hot Water System Recirculation.
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: Broadway Center, Ltd.
- General Contractor: Pentalon Construction
- Architect: Edwards and Daniels Architects, Inc.
- Mechanical Engineer: Colvin Engineering Associates, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing
Thanksgiving Park - Building I
Building Highlights: LEED Silver / Five-Floor Office Building / Total 141,000 Sq.Ft. (28,200 Sq.Ft. per floor) / Start: November 2007 - Completion: November 2008 / Mechanical Systems: One (1) Chiller – 340 Tons (High Efficiency), One (1) Boiler – 2 Million BTU’s (High Efficiency), Six (6) Pumps, Five (5) Air Handling Units, Two (2) Unit Heaters, Two (2) Water Heaters, Sixteen (16) Roof Drains, Thirty (30) Lavatories, Forty (40) Toilets
Additional Info
- Location: Lehi, UT
- Project Owner / Client: Thanksgiving Park
- General Contractor: Camco Construction Co., Inc.
- Architect: Beecher Walker & Associates
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing