Mixed Use Properties
City Creek, Block 75
Building Highlights: Block 75- Contains Central Chiller and Boiler Plant/ Radiant Heating, Cooling, and snowmelt/ 111 For Rent Units/ Approximately 800,000 square feet total retail and for rent properties/Mechanical Systems: One Hundred Two Million (102M) BTU- Hot Water Heating Plant/ Fourteen Hundred (1,400) Ton- Chilled Water Plant/Forty-five (45) Retail Water Source Heat Pumps/One Hundred Thirty-five (135) Residential Water Source Heat Pumps/Six (6) Retail Custom Air Handlers/Seventeen (17) Custom Outside Air Units.
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: City Creek Reserve, Inc.
- General Contractor: Jacobsen Construction Co., Inc.
- Architect: Black Architects
- Mechanical Engineer: Glumac
- Mechanical Contractor: CCI Mechanical, Inc
- CCI Mechanical Role: Heat, Ventilating, Air Conditioning, Plumbing, and Controls
Brigham Apartments
Building Highlights: Multi-building Apartment Complex / One (1) Eight-Story and One (1) Six-Story Building with two (2) levels of parking in each building / Start: September 1996 - Completion: January 1998 / Mechanical Systems: Combined Domestic Hot Water and Fan Coil Heating System and DX Cooling For Individual Apartments; Makeup Air Heating and Cooling In Pool Area and Corridors; Split System and Rooftop Unit Heating & Cooling For Social Rooms and Common Areas; Exhaust Systems Including Underground Parking; Driveway Snowmelt System (8,300 Sq. Ft. Total)
Additional Info
- Location: Salt Lake City, UT
- Project Owner / Client: Zions Securities Corporation
- General Contractor: Okland Construction Co., Inc.
- Architect: Babcock Design Group, Inc.
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Design-Build: Engineering & Design, Heating, Ventilating, Air Conditioning, and Plumbing
Parkway Crossings, Phase I
Building Highlights: Four-Level Student Apartment Buildings Including Living and Retail Space / Three (3) Buildings Total - 80,000 Sq.Ft. Per Building / One Hundred Seventy-Four (174) Apartment Units / Start: December 2002 - Completion: August 2003 / Mechanical Systems: One (1) 250 Ton Air Cooled Chiller, Seven (7) Boilers 13,645 MBTU Total, Two (2) Indirect Fired Make-Up Air Units, Fourteen (14) Pumps, One Hundred Ninety (190) Fan Coil Units, One Thousand Four Hundred Fifty-Four (1,454) Plumbing Fixtures, Four Hundred Fifteen (415) Exhaust Fans, Thirty-Two Thousand (32,000) Feet of PEX Piping for Domestic Hot and Cold Water
Additional Info
- Location: Orem, UT
- Project Owner / Client: Parkway Crossings LLC
- General Contractor: Sahara, Inc.
- Architect: DMJMH+N
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Design-Build: Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing
Parkway Crossings, Buildings B & C
Building Highlights: Four Level Student Apartment Buildings Including Living and Retail Space / Building B – 80,000 Sq.Ft. / Building C – 47,000 Sq.Ft. / Eighty-Eight (88) Apartments Total / Start: January 2004 - Completion: July 2004 / Mechanical Systems: One (1) 250 Ton Air Cooled Chiller, Four (4) Boilers 7,000 MBTU Total, Fourteen (14) Pumps, Eighty Eight (88) Fan Coil Units, One Thousand One Hundred (1,100) Plumbing Fixtures, One Hundred Ninety Eight (198) Exhaust Fans, Twenty Thousand (20,000) Feet of PEX Piping for Domestic Hot and Cold Water
Additional Info
- Location: Orem, UT
- Project Owner / Client: Summit Development
- General Contractor: Sahara, Inc.
- Architect: Curtis Miner Architecture
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing