Distribution Centers
SYSCO
Building Highlights: Food Distribution Facility - 271,616 ft.² / Start: January 2001 - Completion: October 2002 / Mechanical Systems: Five (5) Air Handling Units - 132 Tons Total Cooling, Eight (8) 26,500 CFM Makeup Air Units, Twenty-Three (23) Fan Coil Units, Eighty (80) Plumbing Fixtures, Underfloor Heating System w/10,000'of Underfloor Air Piping, Eight (8) Relief Hoods, Thirty-One (31) Exhaust Fans, One (1) Computer Room Unit w/15 Tons of Cooling, Twenty (20) High Intensity Unit Heaters, Six (6) Gas Fired Unit Heaters, Three (3) Electric Unit Heaters, Two (2) Evaporative Coolers.
Additional Info
- Location: Las Vegas, NV
- Project Owner / Client: SYSCO
- General Contractor: Big-D Construction
- Architect: Jensen Haslem Architects, P.C.
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing
Utah Bishops Central Storehouse
Building Highlights: Storage Distribution Facility- 537,000 Square Feet/ Mechanical Systems: Seven(7) Air Handling Units/Seven(7) Make - Up Air Units/ Twenty - five(25) VAV Terminal Units/ One Hundred-Twenty Six(126) Plumbing Fixtures/ Underfloor Heating System/ Eighteen(18) Warehouse Supply Fans/ Forty-nine(49) Exhaust Fans/ One(1) Computer Room Unit/ Twenty(20) High Intensity Unit Heaters/ Twenty Three(23) Hot Water Unit Heaters/ Two(2) Boilers/ Thirty(30)Warehouse Circulation Fans
Additional Info
- Location: Salt Lake City, Utah
- Project Owner / Client: The Church of Jesus Christ of Latter Day Saints
- General Contractor: Layton Construction Co., Inc.
- Architect: HKS Architect
- Mechanical Engineer: CCI Mechanical, Inc.
- Mechanical Contractor: CCI Mechanical, Inc.
- CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing