Industrial

750x150_INDUSTRIAL.jpg

Malt-O-Meal Plant 3 Process Piping and Ductwork

Building Highlights: Cereal Plant with Three Complete Production Lines: Production Bldg. - 225,000 ft.², Utility Building - 12,000 ft.², Warehouse - 62,000 ft.². Start: June 1999 / Completion: January 2005. Mechanical Systems: Sanitary Stainless Product Piping, Sanitary Stainless Process Piping, Sanitary Stainless Hot Water Jacketed Piping, Process Utility Piping, Corn Syrup Piping, Food Dye Piping, Pneumatic Tubing, Galvanized Compressed Air Piping, Equipment Steam Piping, Custom Stainless Steel Production Ductwork System with Access Doors for Maintenance, Product Line Aspiration System, Stainless Steel Process Fabrication, and Oven Area Fall Protection System


ADDITIONAL INFO

  • Location: Tremonton, UtT
  • Project Owner / Client: Malt-O-Meal Company
  • General Contractor: Big-D Construction, Corp.
  • Architect: Professional Design Group, Inc.
  • Mechanical Engineer: Food Systems Design, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Process Piping, Metal Fabrication, and Ductwork

 

Sweet Candy Company - New Manufacturing Facility

Building Highlights: Office/Warehouse - 180,000 ft.² Total: Office - 18,000 ft.², Warehouse - 50,000 ft.², Production - 112,000 ft.². Construction Schedule: "Fast Track" Start - January 1999 / Completion - June 1999. Mechanical Systems: Three (3) Steam Hot Water Heaters, Hot Water Heat Trace Piping, Stainless Product Piping, Stainless Process Piping, Stainless Hot Water Jacketed Piping, Process Utility Piping, Corn Syrup Piping, Chocolate Piping, Pneumatic Tubing, Dust Collector Ductwork System, and Explosion Dust Systems.


ADDITIONAL INFO

  • Location: Salt Lake City, Utah
  • Project Owner / Client: Sweet Candy Company
  • General Contractor: The Dennis Group
  • Architect: Case, Lowe & Hart
  • Mechanical Engineer: N/A
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Process Piping

 

ITT Project

Building Highlights: Total Building - 250,000 Sq.Ft. / 2-story Office Mezzanine / Start: August 2011 - Completion: February 2012 / Mechanical Systems: Constant Volume, Chilled Water, Process Chilled Water, Central-VAC, Heating Hot Water & Compressed Air.


ADDITIONAL INFO

  • Location: Salt Lake City, UT
  • Project Owner / Client: ITT EDO Fiber Science
  • General Contractor: Okland Construction Co., Inc.
  • Architect: GSBS
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing

 

Otto & Sons Addition

Building Highlights: Total Building - 50,000 Sq.Ft. / Start: February 2011 - Completion: September 11 / Mechanical Systems: HVAC, Process Piping, Steam Distibution & Constant Volume.


ADDITIONAL INFO

  • Location: West Jordan, UT
  • Project Owner / Client: OSI Industries
  • General Contractor: Haskell Construction
  • Architect: Haskell Construction
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc. 
  • CCI Mechanical Role:Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing