Car Dealerships

750x150_CAR DEALERSHIPS.jpg

LHM Lexus of Lindon

Building Highlights: Automobile Sales and Service - 20,100 ft.² / Showroom and Office - 11,400 ft.² / Parts Storage - 2,100 ft.² / Auto Inspection - 2,300 ft.² / Service - 10,300 ft.² / Start: October 2003 - Completion: June 2004 / Mechanical Systems: Seven (7) Rooftop Units - 45 Tons Cooling, Fourteen(14) Exhaust Fans, Two (2) 15,000 CFM Makeup Air Units w/Evaporative Cooling, Three (3) Unit Heaters, Seven (7) Radiant Tube Heaters, Two (2) Relief Hoods, Two (2) Evaporative Coolers, Twenty (20) Plumbing Fixtures, Twelve (12) Roof Drains.


Additional Info

  • Location: Lindon, UT
  • Project Owner / Client: Larry H. Miller Group
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Temperature Controls, and Plumbing

 

Stockton #12 Honda

Building Highlights: Total Building - 38,600 Sq.Ft. / Showroom - 11,000 Sq.Ft., Parts Warehouse - 6,000 Sq.Ft., General Administrative - 9,760 Sq.Ft., Vehicle Service - 11,840 Sq.Ft. / Start: July 1997 - Completion: February 1998 (“Fast Track”) / Mechanical Systems: Nine (9) Rooftop Units - 54 Tons Cooling, Eight (8) Exhaust Fans, One (1) Vehicle Exhaust Fan with a complete Vehicle Exhaust Ductwork System, One (1) Make-up Air Unit, Three (3) Evaporative Coolers, Five (5) Unit Heaters, One (1) Supply Fan and Three (3) Penthouses, One (1) Computer Room Air Conditioning Unit, Three Hundred Eight Feet (380’) Radiant Heat Tubing with Burners and Flues, Thirty-Three (33) Plumbing Fixtures and Eight (8) Floor Drains, Two (2) Water Heaters with Recirculation Pumps and Expansion Tanks, Twelve (12) Primary Roof Drains with Twelve (12) Secondary Overflow Drains


Additional Info

  • Location: Sandy, UT
  • Project Owner / Client: Larry H. Miller Group
  • General Contractor: Sahara, Inc.
  • Architect: Rob E. McQuay Architect and Associates
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

 

Menlove Toyota

Building Highlights: Construction of new dealership including showroom, restrooms, service center, car wash, customer and employee lounges, RTU's, exhaust, plumbing, and snow melt / Total Building - 90,000 Sq.Ft. / Three-stories with mezzanine / Start: January 2008 - Completion: December 2008 / Mechanical Systems:  Seventeen (17) Rooftop Units - 109 Tons Cooling, Fifty-nine (59) Plumbing Fixtures and Thirty-four (34) Floor Drains, Eighteen (18) Primary Roof Drains with Eighteen (18) Secondary Overflow Drains, Seven (7) Stand Alone Manually Adjusted Programmable Thermostats


Additional Info

  • Location: Bountiful, UT
  • Project Owner / Client: Wes Johnson
  • General Contractor: Sahara, Inc.
  • Architect: FFKR
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing